logo

Database:
COLBIB
Search:
TRANPORTTECHNIEK []
References found:
Showing:
1 .. 2   in format [Normal]
page 1 of 1


1 / 2
select
print






Control Number111651
LibraryCentral library
SignatureS S 916 WORDT NIET UITGELEEND
TitlePijpleidingen van Tambaredjo en TA58 naar de Jossiekreek plant gelijktijdig vervangen = Tambaredjo and TA58 pipelines to Jossiekreek replaced simultaneously
InStaatsolie nieuws, , nr. 1 (2016), pp. 14-15
Subjects (Dut.)AARDOLIE; TRANPORTTECHNIEK; BUIZEN; ONDERGRONDSE TRANSPORT; CONSTRUCTIEMIDDELEN; OLIELEKKAGE; VEILIHEIDSMAATREGELEN; STAATSOLIE MAATSCHAPPIJ SURINAME N.V.; SURINAME
Subjects (Eng.)PETROLEUM; TRANSPORT ENIGINEERING; CONSTRUCTION MATERIALS; SAFETY MEASURES




2 / 2
select
print






Control Number101513
LibraryCentral library
SignatureS S 916 WORDT NIET UITGELEEND
TitleDrie pijpleidingen onder de Surinamerivier = Three pipelines in the Suriname river
Main authorAsinga, Sherida
InStaatsolie nieuws, , nr. 3 (2013), pp.22-23
Subjects (Dut.)AARDOLIE; TRANPORTTECHNIEK; BUIZEN; ONDERGRONDSE TRANSPORT; STAATSOLIE MAATSCHAPPIJ SURINAME N.V.; SURINAME




page 1 of 1

  COLBIB : Advanced form

   
Search:
in field:
 
1     
2   
3   
 
shopify analytics